We have SA 2500 2 nos in the primary site and one SA 2000 in the DR site - can we cluster all the three boxes together - if so what is the solution/design if not can i move the existing user lic of SA 2000 to one of the box in primary site , that is SA 2500 - because we have procured only one lic for the SA 2500box incase of teh SA 2500 box both failing - shall we manualy change the lic to the SA 2000 in the DR Kindly reply rgds Ramesh Sivaraman
... View more